GreenGo

Power plants on land, end point, main distribution cabinet and measuring cabinets, the approximate price ranges from 895.00 to 1090.00 KM/KW plus VAT and includes all the listed phases of the Contract, depending on the choice of equipment type and construction on your part

First conversation

Our first conversation with you will be informative and enterprising, in our modern technically equipped offices we will look at all aspects of your project and your wishes for it, which includes:

  • The potential of the location you have in terms of capacity and possibilities of solar power plant installations
  • Within 48 hours, we will provide you with feedback on whether there are technical possibilities for the construction of a solar power plant at your location, as well as connection to the electrical distribution network. ( Dobijanje EES – elektroenergetske saglasnosti na priključak buduće elektrane)
  • We will listen to your financial possibilities and present you with the approximate cost of building the project according to the phases you want.
  • In case you need additional financial resources, our team of financial advisors and experts will analyze your company's balance sheet as well as the analysis of the project itself and suggest the best and most favorable solutions for your project in terms of financing. The long-term experience in the Banking Sector of our founder's team gives you a comparative advantage in finding the most optimal financing model for you. We have cooperation and contacts with all financial institutions, be it banks or funds, both in the RS and in BiH as a whole.
  • Our legal team is at your service to help you with the tax authorities for the needs of going through the procedure of obtaining a VAT number for your company that builds a power plant if one is needed. Also, our legal team can assist you in setting up a startup company just for the needs of a solar power plant
  • During the conversation, you will receive a whole series of necessary information that will help you make the right decision
  • Our first conversation will last up to 30 minutes, so you can plan your time  

Signing the contract and starting the project

Along with the contract you sign with the financial elements, you will receive:

  • DataSheet of all the equipment that is planned and will be installed on your future power plant
  • Gantt chart with precisely defined time and duration of each phase separately, up to technical acceptance, with the contact persons of our company responsible for each of the phases available to you
  • In case of need for financial resources, you will also receive in the attachment the contact person who will take care of the finances of your project
  • A copy of all our licenses and the licenses of our employees
  • Proposal for the appointment of persons responsible for Supervision from the list of renowned experts with whom we cooperate, if you have not already provided the same under your own direction

First steps

  • In addition to financial obligations, the first steps most often include the following activities, which we conduct in parallel
  • Development of UT Terms
  • Preparation of credit applications, mergers with financial institutions and advice on selection (if financing from financial institutions is required)
  • Preparation of soil analyzes if the power plant is operated on land
  • Preparation of wind resistance analyzes for power plants on the ground and on roofs for a specified construction location
  • Obtaining all approvals for the location permit
  • EES results
  • Preparation of the main project and revision with PP protection Elaborate as well as Environmental Elaborate if it is needed
  • Submission of documentation for obtaining a building permit

This process usually takes up to 30 days

Delivery of equipment and construction

Immediately after obtaining the construction permit and securing the complete finances for the project, we register the construction site and deliver the necessary equipment and start construction.

As we mentioned, this process usually takes 15 to 21 days depending on the size of the power plant

During the installation, we do all the necessary certificates and prepare the documentation necessary for technical acceptance, and our construction site managers regularly keep construction diaries about all the daily activities on the construction site.

At the request of the investor, we take on the organization of the construction of the protective fence and the transformer station as well as the connecting line to the access point of the transmission line.

Completion of construction and assistance

Upon completion of construction, we assist in the organization of technical acceptance, connection and commissioning of the power plant.

We organize contacts with authorized traders and help in the analysis and selection of the best offer.

In the meantime, we register the facility in the register of renewable energy sources with the competent institutions, on the basis of which, later, according to the use permit, we assist in obtaining the Green Certificate.

This process takes up to 30 days due to significant administrative activities.

At the end of the trial period, we assist with administrative activities for putting the power plant into actual operation, and thus our contractual relationship has ended except for the domain of guarantees.

Warranties and maintenance

We provide extended guarantees on all the works performed compared to the legal ones due to the quality of the works we perform

Additionally, we install all the necessary applications on your portable devices so that you can monitor the production of your power plant in "online" mode

We offer the option of a power plant operation and maintenance contract that enables online monitoring of the power plant 24/7. Interventions within 24 to 48 hours. Annual contracts for maintenance of the land of the power plant to a height of grass up to 30 cm and washing of solar panels twice a year in spring and autumn.

en_GB